Lab Manager Tip
When deploying a large configuration to a new workspace that requires changing the network and possibly resetting the MAC of the assigned NIC, it is beneficial to utilize the Configuration Diagram afterwards to verify all VMs in the configuration are connected to the correct network.
The Configuration Diagram tab is at the top of the current open configuration.
Leave a Reply